Skip to content
RoomCalcs

Concrete & outdoor

Paver & patio calculator

Work out how many pavers, block paving or patio slabs you need, and how much crushed-stone base and bedding sand to order.

  • Free
  • No sign-up
  • Any unit
  • PDF & CSV
1Area to pave
Common room sizes
2Pavers and joints

Use the real size from the product sheet: a “4 × 8 in” paver is really about 7¾ × 3⅞ in.

Block pavers: 2–5 mm (1/16–3/16 in). Slabs laid on mortar: 10–15 mm (about 3/8–5/8 in).

%

Filled in for your choice above: 5 % for simple shapes, 10 % with lots of cuts.

3Base and bedding

Crushed stone such as MOT Type 1 or crusher run. CMHA (ICPI): 4 in (100 mm) for patios and 6 in (150 mm) for driveways in ideal conditions — add half as much again for each one missing (strong soil, good drainage, no frost). Enter 0 if you are paving over sound concrete.

Compacted crushed stone is about 2.0–2.2 t/m³. Your supplier can give you theirs.

Sand under block pavers: about 25–40 mm (1 in). Slabs on a mortar bed: about 40 mm. Enter 0 for none.

Damp sharp or concrete sand is about 1.6–1.8 t/m³.

Your results

Your results appear here

Type your measurements in the empty boxes. Still needed:

  • Length
  • Width

Save and share

Compare scenarios

Save your numbers, change something and save again to see the options side by side.

Recent calculations

Your last calculations will appear here.

Saved only in this browser. Nothing is uploaded.

How to use this calculator

  1. 1Measure the length and width of the patio, path or driveway, or enter the area if you already know it.
  2. 2Choose your paver or slab, or pick “Other size” and type the real size from the product sheet. Check the joint width.
  3. 3Choose the shape and pattern. Simple shapes need about 5 % spare; curves and herringbone patterns about 10 %.
  4. 4Choose patio or driveway. The base depth fills in; make it deeper on clay, wet or frost-prone ground or if your paver maker asks for more.
  5. 5Read off the pavers to buy and how many tonnes or tons of base stone and bedding sand to order.

The formula

  1. 01Space one paver takes = (length + joint) × (width + joint)
  2. 02Pavers = area ÷ space one paver takes × (1 + spare %), rounded up
  3. 03Base area = (length + 2 × base depth) × (width + 2 × base depth)
  4. 04Base stone = base area × base depth × compacted density
  5. 05Bedding sand = area × bedding depth × density

Every paver takes up its own face plus one joint, so the joint is added to both sides of the size. Sizes on the label are often rounded: a “4 × 8 in” Holland paver is about 7¾ × 3⅞ in, which with ⅛ in joints works out at 4.57 pavers per square foot. With no joint at all, 200 × 100 mm block paving is exactly 50 per m².

The base is the part that carries the load. The Interlocking Concrete Pavement Institute (ICPI) asks for at least 100 mm (4 in) of compacted crushed stone under patios and paths and 150 mm (6 in) under home driveways on well-drained soil, and 50–100 mm (2–4 in) more in cold climates or on wet or weak soil. UK guidance is similar: about 100 mm of MOT Type 1 under a patio and 150 mm under a drive. Some paver makers ask for more, so follow the guide for your product.

Crushed stone shrinks when it is compacted, so the weight is worked out with the compacted density (about 2.1 t/m³, or 1.8 US tons per cubic yard). That weight is what you order: the looser stone the supplier delivers compacts down to the depth you entered. When the area is typed in directly, the base is worked out as if the area were a square, which slightly underestimates the extra edge on a long, narrow path.

Worked example

A 4 m × 3 m patio in 200 mm × 100 mm block paving with 3 mm joints works out at 47.83 per m², so 573.9 pavers before spares.

With 5% spare for cuts, buy 603 pavers.

A 100 mm base that runs past the edges is 1.344 m³ of compacted stone, about 2.82 t, and a 30 mm sand bed needs about 0.65 t of sand.

Tips before you buy

  • Before you dig, find out where buried cables and pipes run (call 811 in the US; check utility maps or use a cable detector elsewhere).
  • Dig out enough for the base, the bedding layer and the paver thickness together, and next to a house keep the finished paving at least 150 mm (6 in) below the damp-proof course, as UK guides advise.
  • Buy all pavers from the same batch, and mix pavers from several pallets as you lay them so small colour differences blend in.
  • Leave the final joint filling until the pavers have been compacted into the bedding sand, then sweep in joint sand and compact again until the joints are full.
  • Keep a few spare pavers after the job. Matching them years later for a repair is often impossible.

Frequently asked questions

How many pavers do I need per square foot or square metre?

It depends on the paver size and the joint. A 4 × 8 in Holland paver works out at about 4.5 per ft², a 12 × 12 in patio stone just under 1 per ft², and 200 × 100 mm block paving about 48 per m² with 3 mm joints (50 with no joint). The calculator shows the exact figure for your size.

How deep should the base be for pavers?

ICPI's guidance is at least 4 in (100 mm) of compacted crushed stone under patios and walkways and 6 in (150 mm) under home driveways on well-drained soil, with 2–4 in (50–100 mm) more in cold climates or on wet or weak soil. Follow your paver maker's guide if it asks for more.

How much sand do I need under pavers?

Pavers sit on a thin screeded layer of coarse bedding sand, nominally 1 in (25 mm) and no more than 1½ in (40 mm) under ICPI's guide specification. UK guides use 25–40 mm of sharp sand. The bedding layer is not for levelling: fix high and low spots in the base instead.

How much extra should I order for cuts?

Oregon State University Extension advises adding 5 % for cuts, or 10 % if you know you will be cutting a lot of pavers: curves, herringbone or diagonal patterns, drains and steps. Small, fiddly areas may need a little more.

Can I lay pavers straight on the soil or on sand only?

Not if you want them to stay flat. Soil moves with the weather and sand alone spreads under load. A compacted crushed-stone base with an edge restraint is what stops pavers from sinking, rocking and spreading apart.

What sand goes between the pavers?

Fine, dry joint sand, kiln-dried sand or polymeric sand swept into the joints after the pavers have been compacted. It locks the pavers together. Coarse bedding sand can be used but is harder to sweep in.

Also searched as: patio calculatorhow many pavers do I needblock paving calculatorpatio slab calculatorpaver base calculatorpaving calculator

Sources

Formulas last reviewed: September 30, 2026 ·How we check our formulas